PLAPCO HOMEOWNER GUIDE

Basic Pool Remodel or Full Pool Remodel?

The dividing line is usually much clearer than homeowners expect: a basic remodel stays inside the pool; a full remodel begins when the surrounding concrete or hardscape is removed.

Tile, coping and a new plaster or pebble finish can often be handled as a focused cosmetic remodel. Once demolition reaches the deck around the pool, the work can affect the skimmer, plumbing, coping, tile, interior finish, electrical bonding and permit scope—creating an entirely different project.

See the Difference
1985Established
FamilyOwned
OwnerOperated
California License #987689
B, C-53 & C-27
Built with pride. Backed by the Pacheco name.
THE SIMPLEST WAY TO UNDERSTAND IT

What Are You Actually Touching?

The size of the pool is not always what determines the remodel category. The most important question is whether the work remains limited to the pool’s visible finish materials—or expands into the surrounding deck and buried systems.

01 BASIC REMODEL

Tile, Finish & Coping

A focused renovation that improves the pool’s appearance while leaving the surrounding deck and most buried systems in place.

  • Drain the pool
  • Remove existing interior finish and waterline tile
  • Replace coping when included in the scope
  • Install new tile and plaster or pebble finish
  • Complete startup and first-month finish care
Typical PLAPCO planning range $30,000–$50,000 Project-specific pricing depends on size, materials, access and condition.
02 FULL REMODEL

Deck Removal Changes Everything

Once the concrete, pavers or other hardscape around the pool is removed, demolition can expose or affect the skimmer, plumbing, coping, tile, bonding and surrounding drainage.

  • Remove existing deck or hardscape
  • Replace affected skimmers and underground plumbing
  • Restore code-compliant equipotential bonding
  • Install new coping, tile, finish and hardscape
  • Address permits, inspections and affected equipment
Typical PLAPCO starting point $100,000+ A typical 500–600 sq. ft. deck replacement can move the project into six figures.
PLAPCO’S PLANNING RULE

The Moment the Deck Is Removed, Plan for a Full Remodel

This is not a sales tactic. It is a construction-planning rule based on how existing pools are assembled and what demolition can disturb. Trying to treat deck removal as an isolated concrete project often creates a chain of repairs that should have been coordinated from the beginning.

THE DOMINO EFFECT

Why Removing the Deck Rarely Stays “Just Concrete”

The pool shell, skimmer, coping, tile, finish, plumbing and deck are not independent pieces. They meet one another at critical transitions. When demolition reaches those transitions, one repair can trigger the next.

01

Deck Demolition Begins

Heavy demolition reaches the concrete immediately surrounding the pool edge and skimmer throat.

02

Skimmer & Plumbing Are Exposed

Older skimmer bodies, throats and nearby pipes can crack, separate or become unsuitable for reconnection.

03

Coping, Tile & Finish Are Affected

Movement and breakage at the pool edge can transfer inward through coping, tile and the finish transition.

04

Bonding Must Be Restored

Removing bonded perimeter concrete can remove the steel or conductors that reduce voltage differences around the pool.

05

Permit Scope Expands

Affected electrical, plumbing, equipment, drainage and safety items may require current-code review and inspection.

The result: What began as a concrete-removal request can become a coordinated reconstruction of the pool edge, buried circulation system, bonding system, equipment connections, finishes and surrounding hardscape.
A CRITICAL SAFETY SYSTEM

What Is Equipotential Bonding?

Bonding is not the same thing as grounding. Its purpose is to connect conductive parts around the pool so they remain at substantially the same electrical potential, reducing dangerous voltage differences where people may be wet or barefoot.

On the gunite pools PLAPCO commonly remodels, the equipotential bonding system uses a minimum No. 8 AWG bare solid copper bonding conductor. The bonded perimeter system is connected to the reinforcing steel in the pool shell at no fewer than four points, spaced around the pool. Those connections tie the pool shell into the conductive system surrounding the pool.

With a reinforced concrete deck, the reinforcing steel in the deck is bonded into that system. When pavers or another surface are installed without suitable reinforcing steel, a code-compliant copper conductor or copper bonding grid is typically installed beneath or within the perimeter surface and connected back to the shell bonding points. The bonded perimeter generally extends 3 feet horizontally beyond the inside wall of the pool.

When a bonded concrete deck is demolished, the steel or bonding conductor within that deck may be removed with it. The replacement deck cannot simply be poured without addressing the bonding system. It must be rebuilt in accordance with the approved plans, electrical code and local inspection requirements.

Why this matters: A missing or incomplete bonding system is not a cosmetic issue. It is an electrical-safety issue and a permit issue.
POOL SHELL
1
2
3
4
Pool shell and reinforcing steel
Bonded perimeter surface
Four typical No. 8 AWG shell-to-perimeter bonding points

Simplified illustration only. The final bonding method, connection locations and inspection requirements are determined by the applicable code, approved plans and local jurisdiction.

SIDE-BY-SIDE SCOPE

Why the Price Difference Is So Large

The difference is not just the cost of new concrete. A full remodel involves more demolition, more trades, more buried work, more inspections and more materials—then still includes the tile, coping and interior finish required in the basic remodel.

Project Component Basic Remodel Full Remodel
Interior finish removal and replacement Included Included
Waterline tile replacement Included Included
Coping replacement As scoped Typically included
Concrete, paver or hardscape demolition Not included Included
Skimmer replacement Usually retained Commonly replaced
Underground pool plumbing Usually retained Evaluated/replaced
Equipotential bonding restoration Deck remains Required where affected
Drainage and grading around pool Limited Rebuilt as scoped
Equipment, controls and electrical upgrades Only if selected As required or selected
Permits and inspections Depends on jurisdiction Commonly required
CURRENT-CODE REVIEW

Full Remodels Can Trigger More Than Cosmetic Requirements

Once a permit reaches electrical bonding, buried plumbing, equipment, heating, drainage or safety systems, the affected work may need to meet the code in effect for that permit. The exact upgrades depend on the jurisdiction, approved plans and project scope. Modern variable-speed equipment, compliant controls and coordinated automation may become part of the project, but requirements are evaluated case by case rather than assumed universally.

REALISTIC BUDGET EXPECTATIONS

Why a Full Remodel Reaches Six Figures

Homeowners often compare a basic tile-and-finish estimate to a full remodel and assume the difference is mostly concrete. It is not. The full remodel adds demolition, export, new hardscape, new plumbing, skimmers, bonding, electrical work, equipment coordination, inspections and site restoration.

With approximately 500–600 square feet of hardscape around an average pool, PLAPCO’s experience is that touching the deck typically moves the project to a minimum six-figure planning level.

These ranges are educational planning figures—not bids or guaranteed prices. Access, material selections, pool size, soil, drainage, hidden conditions, utility work, engineering and local requirements can significantly change the final cost.
Basic Remodel

$30K–$50K

Tile, plaster or pebble, and coping within a controlled cosmetic scope.

The Important Difference

Systems

You are no longer replacing finishes—you are rebuilding the pool and deck as a connected system.

QUICK PROJECT CHECK

Which Remodel Path Fits Your Project?

Select everything you are considering. The result reflects PLAPCO’s planning approach and is not a substitute for an on-site evaluation.

?
YOUR PLANNING PATH

Select Your Project Items

Check the work you are considering to see whether it aligns more closely with a basic remodel or full remodel.

Discuss Your Pool
COMMON HOMEOWNER QUESTIONS

Basic vs. Full Remodel FAQs

PLAPCO generally does not treat deck removal around an existing pool as an isolated concrete job. Demolition can damage the skimmer, coping, tile, finish transition, plumbing and perimeter bonding system. We plan the work as a coordinated full remodel so the affected systems can be rebuilt correctly rather than repaired piecemeal after damage occurs.
The skimmer throat passes through the pool wall and meets the deck at the pool edge. Existing concrete is commonly placed tightly around the skimmer body and throat. Breaking and removing that concrete can crack the skimmer, separate connections or expose aging plumbing that should not simply be buried again.
Not automatically. Equipment requirements depend on its condition, the approved project scope, energy-efficiency requirements and local plan review. A full remodel often creates a practical opportunity to replace aging equipment and coordinate modern controls, but the final equipment package is project-specific.
A localized repair may be possible in some situations, especially when it is away from the coping, skimmer and bonded perimeter work. The location, demolition method, existing bonding and desired finished appearance must be evaluated before deciding whether the project can remain limited.
The tile line, grout and interior finish work together at an important transition. Leaving older tile in place can create a future failure point above a brand-new finish. Replacing the tile during refinishing allows the transition to be rebuilt cleanly, protects the bond beam and avoids risking damage to the new finish if old tile fails later.
No. They are general planning ranges based on PLAPCO’s local project experience. Every pool must be evaluated individually. Access, materials, deck area, plumbing, equipment, drainage, soil, permits, engineering and hidden conditions all affect the final proposal.
NOT SURE WHICH REMODEL YOU NEED?

Start With a Conversation

We begin with a phone conversation to understand the condition of your pool, the areas you want to change and whether the surrounding hardscape is part of the project.