The Construction Sequence
Follow the typical progression from draining and demolition through masonry, interior finish, filling and startup.
A clear, homeowner-friendly guide to what happens from the day your pool is drained through the first weeks of caring for your new finish.
Every remodel is different, but most projects follow the same general sequence. This guide explains the activity you may see, the timing of each stage, and the homeowner responsibilities that help protect the finished result.
Understanding the sequence of work makes the remodel experience easier. You will know why each phase is happening, what the site may look like, and when your participation becomes especially important.
Follow the typical progression from draining and demolition through masonry, interior finish, filling and startup.
Each phase includes a general timing range. Actual schedules may vary based on scope, materials, weather and site conditions.
Filling and brushing instructions are critical. Proper early care directly affects how the new finish develops and looks.
The remodel journey begins with draining the existing pool. Our team installs a submersible pump in the deep end and routes a discharge hose to the nearest sanitary clean-out.
Once the pump is installed and the equipment and automatic fill are shut off, you will see the water level begin to drop.
Usually started the day before demolition or preparation work begins.
After the pool is drained, our crew begins the strip-out phase. Relief holes are drilled in the pool floor to relieve underground pressure. The existing interior finish and tile are then removed.
If your contracted scope includes coping or other masonry, those materials are removed during this phase as well.
This is one of the loudest and most active stages. Jackhammers and demolition equipment will be used, and debris will be removed from the property.
Approximately two to four days, depending on pool size, access and site conditions.
Once preparation work is complete, the decorative masonry elements included in your scope are installed. This may include waterline tile, coping, veneer stone, raised walls, steps or other masonry features.
This phase is where the pool begins to take on its finished character. Straight lines, clean transitions and careful material placement make a noticeable difference in the final result.
Skilled masons will lay out and install the selected materials. Work may appear methodical because alignment and detail matter.
Approximately two to seven days, depending on material selections, layout complexity and the amount of masonry included.
The selected plaster or pebble surface is applied by a specialized finishing crew. This is the interior surface that you will see and feel whenever you use the pool.
The finish is mixed, applied and hand-troweled during a coordinated installation. The initial application is generally completed in a single day.
One day for application. Pebble finishes are normally acid-washed the following morning before the water fill begins.
A freshly applied pebble finish may look hazy, chalky, uneven or imperfect while it is dry. You may also notice small pinholes, minor surface variations, trowel marks or areas where fewer pebbles appear to be exposed.
This is normal during the initial installation stage. The finish should not be judged based on how it looks immediately after it is applied.
The finishing crew returns the following morning to acid-wash and clean the surface. During that visit, they expose the pebble, remove surface residue and fill or address small holes and minor imperfections where necessary.
Most minor visual concerns improve substantially after this process and become much less noticeable once the pool is completely filled with water.
Once the pool is full, a CPO-certified pool service company should complete the startup. The service company will begin balancing the water, follow the startup procedure and explain the early care requirements.
Water chemistry is managed carefully while the new surface cures. The pool may continue producing plaster dust during the early days.
Startup begins after the pool is filled and continues through the initial curing and water-balancing period.
Proper brushing is one of the most important things the homeowner can do to help the new plaster or pebble finish cure and develop properly.
Unless your written agreement states otherwise, brushing the new interior finish is the homeowner’s responsibility. The entire pool surface—including the walls, floor, steps, benches and corners—should be brushed twice daily during the first 14 days.
Brushing removes plaster dust, helps the finish cure more evenly and assists with exposing the pebble aggregate.
Pay special attention to areas where the surface appears smoother or where fewer pebbles are visible.
Continue brushing the entire pool—not only the areas that look different. Consistent brushing helps create a more uniform final appearance.
Do not stop the water once filling begins. Continue until the water reaches the middle of the tile line.
Brush all interior surfaces twice daily for the first 14 days. Brushing is critical and is the homeowner’s responsibility.
Do not turn on the pool heater during the first 28 days while the finish is curing.
Do not add salt for at least 30 days. PLAPCO recommends waiting approximately 90 days.
Learn more about finishes, waterline tile, coping, masonry and complete pool transformations.
View Remodeling Services → Completed WorkBrowse completed pools, remodels, hardscape and outdoor living projects.
Visit the Project Gallery → Questions & AnswersGet straightforward answers about planning, construction, materials and working with our company.
Read the FAQs →We begin with a phone conversation to learn about your pool, your priorities and the scope of work you are considering.